Tailored Ship Car Deck Rebuilding to Extend Vessel Lifespan
A major superstructure rebuild completed in just 321 days—61 days ahead of schedule. The project covered Decks 7 to 12, including a new navigation bridge, fully outfitted cabins, complete piping and cabling renewal, and a full ventilation system overhaul. With 2,000 tons of steel, 3,000 meters of piping, 244 km of cabling, and 2,000 light fixtures replaced—without available drawings—our team delivered exceptional engineering solutions. Following disassembly, the vessel was carefully towed to a drydock facility for full structural restoration and reassembly, including comprehensive work such as lifeboat engine renewal.