Efficient CPP Propeller Removal and Reinstallation
Removal of CPP propeller blades and hub was completed in dock. Elements were dressed as required, ensuring all surfaces met operational standards. Final installation of the hub and blades was successfully carried out following inspection. All procedures adhered to safety and quality protocols. Alignment and securing of components were verified, ensuring full functionality.
The propeller system was tested post-installation with satisfactory results. The job was completed efficiently, meeting both technical and scheduling
requirements for vessel readiness.